Hub / Home
Directory & Insights
Live Journey Map
Crowdsourced Live Journey
Timetables
Train Schedules
Search Routes
Direct & Transit Finder
Extraordinary Trains (EOT)
Extraordinary Trains
Train Directory
Master Train Fleet
Fleet Database
Rolling Stock Info
Stations
Facilities & Hubs
Facilities
Depots & Workshops
Operating Areas
Daop & Divre
Incidents & Safety (EOE)
Historical Rail Incidents
Updates & News
Railway Dispatches & Insights
Photo Gallery
Curated Collection
alurail pass
Supporter Perks
About alurail
Platform Info & Vision
B
Commuter Line / Lokal
Gapeka 2025
Active on Line Now
KA Commuter Line Bandung Raya
Main Corridor:
Padalarang (PDL) Cicalengka (CCL)
The Commuter Line Bandung Raya is a vital regional transit backbone connecting Padalarang to Cicalengka, delivering reliable, high-capacity, and subsidized daily mobility across the Bandung metropolitan area.
Summarized by Gemini AI
Daily Trips
37
Active Operational Trips
Average Duration
± 1h 49m
Per Journey Leg
Route Distance
43 km
Average Track Length
Calling Stops
13
Scheduled Halts
Service Overview & Profile
The Commuter Line Bandung Raya, historically known as *Lokal Bandung Raya*, is a prominent regional passenger rail service operating within the Bandung Metropolitan Area of West Java, Indonesia. Managed by KAI Commuter—a subsidiary of the national railway operator Kereta Api Indonesia—the service forms the backbone of local transit. Its primary corridor connects Padalarang in West Bandung Regency to Cicalengka in Bandung Regency, traversing the densely populated heart of the Bandung basin and serving as a vital artery for daily commuters, students, and urban workers moving across the provincial capital.
As a driver of regional mobility, the service significantly mitigates urban congestion by offering a reliable, high-capacity alternative to road transport. The rolling stock has historically relied on modernized diesel multiple units (DMUs) and locomotive-hauled passenger trains, which have undergone progressive overhauls to ensure structural reliability and improved passenger comfort. By seamlessly linking peripheral residential zones with key commercial and educational hubs in Bandung city proper, the service underpins the socio-economic integration of the greater metropolitan region, fostering sustained regional development and accessibility.
Operating under the national rail schedule framework (Gapeka 2025), the service runs 37 scheduled trips daily across a route distance of approximately 43 kilometers. Passengers traverse a network of 13 scheduled stations along the alignment, with the end-to-end journey maintaining an average transit time of 1 hour and 49 minutes. To ensure affordability and equitable access for the general public, the service is categorized under the Economy Public Service Obligation (PSO) class, receiving state operational support to maintain subsidized fare structures for all travelers.
As a driver of regional mobility, the service significantly mitigates urban congestion by offering a reliable, high-capacity alternative to road transport. The rolling stock has historically relied on modernized diesel multiple units (DMUs) and locomotive-hauled passenger trains, which have undergone progressive overhauls to ensure structural reliability and improved passenger comfort. By seamlessly linking peripheral residential zones with key commercial and educational hubs in Bandung city proper, the service underpins the socio-economic integration of the greater metropolitan region, fostering sustained regional development and accessibility.
Operating under the national rail schedule framework (Gapeka 2025), the service runs 37 scheduled trips daily across a route distance of approximately 43 kilometers. Passengers traverse a network of 13 scheduled stations along the alignment, with the end-to-end journey maintaining an average transit time of 1 hour and 49 minutes. To ensure affordability and equitable access for the general public, the service is categorized under the Economy Public Service Obligation (PSO) class, receiving state operational support to maintain subsidized fare structures for all travelers.
Operating Corridor
Padalarang (PDL) Cicalengka (CCL)
Active Train Numbers
352, 353, 354, 355, 356, 357, 360, 361, 362, 363, 364, 365A, 366, 367, 371, 372, 373, 374, 375, 376, 377, 380, 381, 382, 383, 384, 385, 386, 387, 388, 392, 393, 394, 395, 396, 397, 398A
Average Journey Duration
± 1h 49m (43 km)
Service Classes
Eco PSO
Interactive Route Geometry & Station Halts
Displaying route track with OpenRailwayMap railway network overlay.Available Service Classes
Eco PSO
Standard onboard seating & amenities